To be eligible for the PECB ISO-IEC-27001-Lead-Auditor exam, candidates must have a minimum of five years of professional experience, with at least two years of experience in information security management. They must also have completed a PECB-certified ISO/IEC 27001 Foundation training course or have equivalent knowledge. ISO-IEC-27001-Lead-Auditor exam consists of two parts: a written exam and a practical exam. The written exam is four hours long and consists of 150 multiple-choice questions. The practical exam is two hours long and requires candidates to demonstrate their auditing skills in a simulated audit scenario. Upon successful completion of both exams, candidates will be awarded the PECB Certified ISO/IEC 27001 Lead Auditor certification.

PECB ISO-IEC-27001-Lead-Auditor exam is a rigorous and comprehensive assessment of a candidate’s knowledge and skills in leading an ISMS audit team and conducting an audit according to the requirements of ISO/IEC 27001:2013 standard. It is a valuable certification for professionals who wish to advance their careers in information security management and auditing and demonstrate their expertise in the field.

 

NO.150 As a new member of the IT department you have noticed that confidential information has been leaked several times. This may damage the reputation of the company. You have been asked to propose an organisational measure to protect laptop computers. What is the first step in a structured approach to come up with this measure?

 
 
 
 

NO.151 You are performing an ISMS audit at a residential nursing home (ABC) that provides healthcare services. The next step in your audit plan is to verify the information security of ABC’s healthcare mobile app development, support, and lifecycle process. During the audit, you learned the organization outsourced the mobile app development to a professional software development company with CMMI Level 5, ITSM (ISO/IEC 20000-1), BCMS (ISO
22301) and
ISMS (ISO/IEC 27001) certified.
The IT Manager presented the software security management procedure and summarised the process as following:
The mobile app development shall adopt “security-by-design” and “security-by-default” principles, as a minimum.
The following security functions for personal data protection shall be available:
Access control.
Personal data encryption, i.e., Advanced Encryption Standard (AES) algorithm, key lengths: 256 bits; and Personal data pseudonymization.
Vulnerability checked and no security backdoor
You sample the latest Mobile App Test report, details as follows:

The IT Manager explains the test results should be approved by him according to the software security management procedure. The reason why the encryption and pseudonymisation functions failed is that these functions heavily slowed down the system and service performance. An extra 150% of resources are needed to cover this. The Service Manager agreed that access control is good enough and acceptable. That’s why the Service Manager signed the approval.
You are preparing the audit findings. Select the correct option.

 
 
 
 

NO.152 Please match the following situations to the type of audit required.

NO.153 In the context of a third-party certification audit, confidentiality is an issue in an audit programme. Select two options which correctly state the function of confidentiality in an audit

 
 
 
 
 
 

NO.154 You are an experienced audit team leader guiding an auditor in training, Your team is currently conducting a third-party surveillance audit of an organisation that stores data on behalf of external clients. The auditor in training has been tasked with reviewing the TECHNOLOGICAL controls listed in the Statement of Applicability (SoA) and implemented at the site.
Select four controls from the following that would you expect the auditor in training to review.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NO.155 Which measure is a preventive measure?

 
 
 

NO.156 You are conducting a third-party surveillance audit when another member of the audit team approaches you seeking clarification. They have been asked to assess the organisation’s application of control 5.7 – Threat Intelligence. They are aware that this is one of the new controls introduced in the 2022 edition of ISO/IEC
27001, and they want to make sure they audit the control correctly.
They have prepared a checklist to assist them with their audit and want you to confirm that their planned activities are aligned with the control’s requirements.
Which three of the following options represent valid audit trails?

 
 
 
 
 
 
 
 

NO.157 CMM stands for?

 
 
 
 

NO.158 Which three of the following work documents are not required for audit planning by an auditor conducting a certification audit?

 
 
 
 
 
 

NO.159 You are an experienced audit team leader guiding an auditor in training, Your team is currently conducting a third-party surveillance audit of an organisation that stores data on behalf of external clients. The auditor in training has been tasked with reviewing the TECHNOLOGICAL controls listed in the Statement of Applicability (SoA) and implemented at the site.
Select four controls from the following that would you expect the auditor in training to review.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NO.160 A property of Information that has the ability to prove occurrence of a claimed event.

 
 
 
 

NO.161 You are performing an ISMS initial certification audit at a residential nursing home that provides healthcare services. The next step in your audit plan is to conduct the closing meeting. During the final audit team meeting, as an audit team leader, you agree to report 2 minor nonconformities and 1 opportunity for improvement as below:

Select one option of the recommendation to the audit programme manager you are going to advise to the auditee at the closing meeting.

 
 
 
 
 

NO.162 Who is authorized to change the classification of a document?

 
 
 
 

NO.163 There was a fire in a branch of the company Midwest Insurance. The fire department quickly arrived at the scene and could extinguish the fire before it spread and burned down the entire premises. The server, however, was destroyed in the fire. The backup tapes kept in another room had melted and many other documents were lost for good.
What is an example of the indirect damage caused by this fire?

 
 
 
 

NO.164 A planning process that introduced the concept of planning as a cycle that forms the basis for continuous improvement is called:

 
 
 
 

NO.165 You are an ISMS audit team leader tasked with conducting a follow-up audit at a client’s data centre. Following two days on-site you conclude that of the original 12 minor and 1 major nonconformities that prompted the follow-up audit, only 1 minor nonconformity still remains outstanding.
Select four options for the actions you could take.

 
 
 
 
 
 
 
 

NO.166 Integrity of data means

 
 
 

NO.167 You are an ISMS audit team leader preparing to chair a closing meeting following a third-party surveillance audit. You are drafting a closing meeting agenda setting out the topics you wish to discuss with your auditee.
Which one of the following would be appropriate for inclusion?

 
 
 
 

NO.168 You are an experienced ISMS audit team leader. You are currently conducting a third-party surveillance audit of an international haulage organisation. You have sampled four internal audit reports which state:
Report 1 – Auditor: Mr James.
Over the year the organisation has failed to meet its promised delivery dates on 23 occasions out of 100. This is against a target of ‘95% of deliveries on time’.
Grading – Minor
Corrective Action due: Within 9 months.
Report 2 – Auditor: Mr James.
Between January and March, it was noted 125 complaints were received about the Service Desk Team. Clients accused them of being rude and unresponsive.
Grading – Minor
Corrective Action due: Within 12 months.
Report 3 – Auditor: Mr James.
Of the 40 customer orders received last month, 38 were correctly processed. Of the remaining 2, one was missing a signature and one was missing a date.
Grading –
Corrections due: Within 3 weeks
Report 4 – Auditor: Mr Rogers.
Of the 30 personnel records examined, 26 were found to be fully completed whilst the remaining 4 were all missing the individual’s start date.
Grading – Major
Corrections due: Within 1 week
Which four of the options demonstrate the concerns you would have about these reports?

 
 
 
 
 
 
 
 

NO.169 Which of the following does a lack of adequate security controls represent?

 
 
 
 

NO.170

NO.171 Which one of the following options describes the main purpose of a Stage 1 audit?

 
 
 
 

NO.172 Select the words that best complete the sentence:


ISO-IEC-27001-Lead-Auditor Dumps PDF and Test Engine Exam Questions: https://www.examstorrent.com/ISO-IEC-27001-Lead-Auditor-exam-dumps-torrent.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt www.askmap.net myportal.utt.edu.tt justpaste.me fortunetelleroracle.com

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below