1Z0-1075-21 Oracle
Rate this post

1Z0-1075-21 100% Guarantee Download 1Z0-1075-21 Exam PDF Q&A [Dec 08, 2022]

Get 1Z0-1075-21 Actual Free Exam Q&As to Prepare for Your Oracle Certification

Oracle 1Z0-1075-21 Exam Syllabus Topics:

Topic Details
Topic 1
  • Reporting and Analytics for Manufacturing
  • Describe Manufacturing Cloud integrations
Topic 2
  • Create manufacturing Production Exceptions, including raising exceptions and managing and resolving exceptions
  • (New) Set up common Configuration Elements
Topic 3
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
  • Describe how work definition is automatically generated
Topic 4
  • Create and update Work Orders for standard and non-standard Work Orders and Serialized Manufacturing
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 5
  • Describe Managerial Accounting Basics & Cost Accounting
  • Explain Work Order Reservations and History
Topic 6
  • Explain Common Inventory Configurations
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
Topic 7
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
Topic 8
  • Describe Manufacturing Supervisor Mobile Applications
  • Transfer Production Transactions to Costing
Topic 9
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Production Transaction Review and Product Genealogy

 

Q35. Identify two reports that provide work ordercost-related information to the costing user.

 
 
 
 

Q36. Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

 
 
 
 

Q37. Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of productsmanufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

 
 
 
 
 

Q38. In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

 
 
 
 

Q39. Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

 
 
 
 
 
 

Q40. In a manufacturing plant, a production operator in a givenshift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

 
 
 
 
 

Q41. Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

 
 
 
 

Q42. You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

 
 
 
 

Q43. Identify three requirements fulfilled by nonstandard work orders.

 
 
 
 

Q44. Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

 
 
 
 

Q45. The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

 
 
 
 
 

Q46. The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

 
 
 
 

Q47. Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.

 
 
 
 
 
 

Q48. A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Whichscheduled process should you run to achieve this requirement?

 
 
 
 

Q49. Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?

 
 
 
 

Q50. An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.

 
 
 
 

Q51. In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transferthe assembly to cost accounting in frozen type.

 
 
 
 
 
 

Q52. Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automaticwork definition.

 
 
 
 

1Z0-1075-21 Questions Truly Valid For Your Oracle Exam: https://www.examstorrent.com/1Z0-1075-21-exam-dumps-torrent.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below