NO.13 During a second-party audit at a sawmill, you find that the OHSMS Manager conducted the hazard identification process. In the risk assessment report, hazards were listed as physical hazards, chemical hazards, biological hazards and psychosocial hazards, with the hazards categories as low medium and high to be addressed. The OHSMS Manager did not have an action plan for low and medium risks, saying that they ignored those He stated that they brought in a health and safety consultant to advise on treatment for the high risks.
When interviewing the OHSMS Manager, the auditor presents a nonconformity relating to potential hazards In the factory If the dust extraction system broke down. The OHSMS Manager said that. If that happened, the agreed planned action is that workers would put masks on.
Select one of the options for how the auditor should respond to this statement.

 
 
 
 

NO.14 Showitoff is an organisation spcialising in the design and production of wall decorating material for the domestic market. During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as several rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are visible. When asked about it, the OHS Manager states that he presume that the material come from maintenance work, so it is the Maintenance Manager’s responsibility.
The auditor interviews the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess materials that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable collapse at any moment. The Maintenance Manager is not aware of such a situation.
Which three statement represent good audit practice?

 
 
 
 
 
 
 
 

NO.15 An adventure park has the following and safety policy document displayed in the reception area:
This organization is committed to providing safe experiences, In accordance with health and safety regulations for their delivery. The organisation will strive to increase the health and safety awareness of its personal, contracts and customers. Continual health and safety improvement is a permanent objective of the organisation. This policy shall be communicated to all interested parties.
Referring to the policy statement, select three options for which the organization is meeting ISO 45001 requirements.

 
 
 
 
 
 
 
 
 

NO.16 A trainee audit team leader Is being coached by an experienced audit team leader prior to carrying out his first Stage 2 certification audit in the team leader role. They are discussing the typical contents of audit reports and the experienced audit team leader is keen to ensure the trainee understands what such reports should contain.
Which three of the trainee’s responses are incorrect?

 
 
 
 
 
 
 
 

NO.17 Wash-it-up is an organization that provides window cleaning services for the industrial sector. It has been certified t ISO 45001 for some time and has appointed a new OHS Manager. The audit plan during a surveillance audit includes the improvement actions and the auditor asks to see the most recent management review meeting minutes.
surveillance audit includes the Improvement actions and the auditor asks to see the most recent management review meeting minutes.
Which six of the statements would represent output audit evidence for the management review?

 
 
 
 
 
 
 
 
 
 

NO.18 Wokrer’s participations is a key factor for the success of OHSMS. Which three of the following ISO 45001 activities require workers’ participation?

 
 
 
 
 
 

NO.19 An audit team leader arrives at a steel fabrication organisation that manufactures stairways to carry out a Stage2 certification audit. At a meeting with the OHSMS Manager, she is told that they have won their biggest contact from a construction organization to manufacture and install stairways.
During the audit, a team member found that several employees had suffered hand injuries over several months due to handrail welds not being property polished. The OHSMS Manager blames the new employees they had to take on because of the big contract. The auditor raises a nonconformance against clause 10.2 erf ISO 45001.
In relation to the nonconformity raised by the auditor and in line with the policy of the certification body, the audit team raise improvement opportunities in the audit report.
Which three of the options would represent acceptance opportunities for improvement in the report?

 
 
 
 
 
 
 
 

NO.20 Out of the following, which is not the Part of PDCA cycle of ISO 45001? Select the correct option, and then select Submit.

 
 
 
 

NO.21 Like many other quality management systems, ISO 45001 uses what is known as a ‘PDCA’ circle. What do those initials stand for?

 
 
 
 

NO.22 Which two of the following are examples of audit objectives for the audit team?

 
 
 
 
 

NO.23 During an internal audit of an OHSMS, what evidence would the auditor look for to demonstrate conformity to ISO 45001? Match each item with the correct ISO 45001 clause number.

NO.24 What is the definition of the term ‘audit’ as per clause 3.32 of ISO 45001:2018?

 
 
 
 

NO.25 You identify that the OSHMS manager conducts a safety inspection of the building each day before the museum opens to the public. You review your latest report and note that there seems to be some confusion between what constitutes a hazard and what constitutes a risk.
Which three of the following observations has the OHSMS manager correctly rated?

 
 
 
 
 
 
 
 

NO.26 Out of the following, which is not the Part of PDCA cycle ISO 45001? Select the correct option, and then select Submit.

 
 
 
 

NO.27 You are an audit team leader conducting an ISO 45001 surveillance audit of a nautical college that provides course for those working in the maritime sector. The College Principle Is absent, and you are interviewing the Deputy (DP) DP: 1 apologise for the absence of the College Principle. He has called in sick today and we are really short of staff.
You: 1 see, it really should not affect the OHSMS so the audit can progress as normal.
DP: The College principle set up the system. I am afraidi am not as familiar with it as he is.
You: OK, let’s start with the OH and S policy. What are the main issues for the OHSMS here?
DP: Give me a minute. I need look at the OH and S Policy on the noticeboard in his office.
As the audit progresses, It is clear that the Deputy College Principle has a very low knowledge of the OHSMS. He continually has to search the answers to your questions or asks staff members about their processes.
Choose one of the following options that best describes the basis for the nonconformity.

 
 
 
 

NO.28 Showitoff is an organization specialization in the design and production of wall decorating materials for the domestic market.
During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as serveral rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are available. When asked about it, the OHS Manager states that he presumes that the materials come from maintenance work, so it is the Maintenance Manager’s responsibility.
The auditor interview the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess material that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable and could collapse at any moment. The Maintenance Manager is not aware of such a situation.
The auditor decides to review the process for evaluation of compliance with health and safety regulations in more depth.
Select six option that provide a meaningful audit trail for this process.

 
 
 
 
 
 
 
 
 
 

NO.29 An audit team leader arrives at a fabrication organisation that manufactures stairways to ..certification audit. At a meeting with the OHSMS Manager the audit finds that the responsibility for worker consultation and participation lies with the managerial team. Select from the options four actions by the managerial team that encourage worker consultation and participation.

 
 
 
 
 
 
 
 

NO.30 An internal auditor of a manufacturer of plastic packaging products for the food industry raised a nonconformity against section 10.2 of ISO 45001 in Report IA202. The nonconformity (NC3) stated: “The level of reported health and safety incidents has increased by 9.7% over the last 12 months. This included an increase in reported accidents.” A third-party auditor reviewing the internal audit process came across the nonconformity and found that there was no evidence of having been reported to relevant staff. Select three of the following nonconformities that the auditor could raise to ISO 45001.

 
 
 
 
 
 

Easy Success PECB ISO-45001-Lead-Auditor Exam in First Try: https://www.examstorrent.com/ISO-45001-Lead-Auditor-exam-dumps-torrent.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below