Q18. You are planning to use DMO of SUM to perform an “inplace-migration” to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

 
 
 
 
 

Q19. When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q20. You have chosen the “Advanced” option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q21. You downloaded content from the SAP note 1000009 (“ASU Toolbox 2008”). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

 
 
 
 

Q22. You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

 
 
 
 

Q23. Which Guides contain information about SUM phases starting with “EU_CLONE_”?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q24. Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.

 
 
 
 
 

Q25. You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

 
 
 
 

Q26. You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

 
 
 
 

Q27. What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

 
 
 
 

Q28. You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

 
 
 
 

Q29. What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

 
 
 
 

Q30. What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

 
 
 
 
 

Q31. You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

 
 
 
 

Q32. You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

 
 
 
 

Q33. You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step “Configuration”. For some software components you find entries in the “Calculated level” column.
What does the “Calculated level” indicate for those software components?
Please choose the correct answer.
Response:

 
 
 
 

Q34. You have selected “Standard” as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

 
 
 
 

Get ready to pass the E_S4HCON2023 Exam right now using our SAP Certified Technology Specialist Exam Package: https://www.examstorrent.com/E_S4HCON2023-exam-dumps-torrent.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt

admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below